Chat with us, powered by LiveChat In this Module, you are responsible for creating a Status Update and a Software Installation Plan. The following item(s) are required in this Module: - Tutorie

In this Module, you are responsible for creating a Status Update and a Software Installation Plan. The following item(s) are required in this Module:

 

Module 04 Content

  1. Question <bdi></bdi>In this Module, you are responsible for creating a Status Update and a Software Installation Plan.

    The following item(s) are required in this Module:

    • Status Update
    • Utilize this Status Update template to provide the following:
    • Module04 Status Update Template
    • Work Completed Last Week
    • Work Planned for Next Week
    • Open Issues
    • Open Risks
    • Deliverables and Milestones
    • Key Performance Indicators (KPI's) and Remediation Plan
    • Software Installation Plan
    • Utilize this Software Installation Plan template to detail the requirements for installing various pieces of software:
    • Module04 Software Installation Plan Template
    • Required Items
    • Pre-installation Configurations
    • Installation Steps
    • Post-Installation Configurations
    • Post-Installation Maintenance
    • Note: The templates have comments in blue italics that will provide guidance as to what is typically included in each section. Please delete these comments before submitting your completed template.

      Sample Document

      Use the following sample document as a reference for your Status Update Plan document. Note that the sample may be different from the template provided and is only a reference. Your own submission must make use of the project template provided and be written in your own words.

Module 04 Status Update

[Insert Name]

Network Administration Capstone

Project Status Update

Work Completed Last Week 2 Work Planned For Next Week 2 Open Issues 2 Open Risks 2 Deliverables and Milestones 2 Key Performance Indicators (KPI's) and Remediation Plan 3

Project Status Summary Percent Complete: xx %

Project Status Summary: This section provides a quick executive overview of the status of the project. It is intended for high level management so it should not get too much into the details of the project. However, it should highlight anything specific which should be brought to their attention. The Scope/Schedule/Cost/Quality table above is a quick way to present a color coded dashboard for the status report. Typically a variance of +/- 5% will warrant a yellow cautionary color and +/- 10% will warrant a red warning color. For a project which needs tighter control +/- 2% and +/- 5% are used for these thresholds; whereas, other projects with less strict control may use 10% and 20% variances. The percent complete here should be the percent completion of the entire project. For any constraint which is yellow or red this section should contain brief explanation the reason why.

Work Completed Last Week

Work Completed Last Week: In this section you should provide a highlight of work performed and milestones and/or deliverables met during the past week.

Work Planned For Next Week

Work Planned for Next Week: Provide an overview of the work being performed during the next week and any milestones or deliverables you expect to meet.

Open Issues

Open Issues: This section should contain a list of open issues along with their status.

Open Risks

Open Risks: This section should contain a list of all open risks (risks which have occurred, or are on the verge of occurring).

Deliverables and Milestones

Deliverables and Milestones: This section is a quick table which shows the status of the project milestones and deliverables.

The first column is for the name of the Milestone or Deliverable as it's in the project plan. The next column is the WBS number, this makes it easier to find the milestone/deliverable in the project plan. Planned is the planned date according to the approved project plan, the forecasted is the date you expect and actual is the actual date the milestone was met or deliverable was delivered. The status is a simple one or two word status such as; completed, on schedule, behind schedule, accepted, etc.

Milestone

WBS

Planned

Forecasted

Actual

Status

Deliverable

WBS

Planned

Forecasted

Actual

Status

Key Performance Indicators (KPI's) and Remediation Plan

KPI: Many managers turn right to this section as it provides a clear view of the status of the project according the earned value metrics. In your project you need to decide which metrics to monitor, but be sure not to include too many as you may end up providing the same information but in different forms. We like to track SV, SPI, CV and CPI in the layout below.

Below the schedule and cost headings you will state whether the project is ahead of or behind schedule and over or under budget. Since it is highly unlikely that you will be on schedule and/or on-budget, for this section you must assume that you are in fact either off schedule or overbudget. Provide a thorough plan to address one of these problems. Your plan should demonstrate a strong understanding of the challenges and setbacks you are likely to face.

If you like you can also include a paragraph at the beginning of this section presenting the earned value results in verbose.

Schedule – Project is Ahead of/Behind Schedule

Schedule Variance (SV): $xxxx

Schedule Performance Index (SPI): x.xx

Cost – Project is Over/Under Budget

Cost Variance (CV): $xxx

Cost Performance Index (CPI): x.xx

3

,

Module 04 Software Installation Plan

[Insert Name]

Network Administration Capstone

Software Installation Plan

Required Items 2 Pre-installation Configurations 2 Installation Steps 2 Post-Installation Configurations 2 Post-Installation Maintenance 2

Introduction

Introduction: Introduce what this plan will accomplish and the target audience.

Required Items

Required Items: Identify any required items – hardware, installation discs, license keys, etc.

Pre-installation Configurations

Pre-Installation Configurations: Are there any configurations required before installation. For example, some Microsoft applications require .Net to be installed first.

Installation Steps

Post-Installation Configurations: Are there any post-installation configurations? For example, some applications allow you to enable automatic updates, make backups of installation files, etc.

Post-Installation Configurations

Post-Installation Configurations: Are there any post-installation configurations? For example, some applications allow you to enable automatic updates, make backups of installation files, etc.

Post-Installation Maintenance

Post-Installation Maintenance: What are some best practices to maintain the functionality of this software? How will updates be applied? Who should the users contact for support?

1

,

Module 04 Status Update Sample

Network Administration Capstone

Project Status Summary Percent Complete: xx%

The project schedule is 7% behind schedule due to inclement weather which has affected the installation of the fiber optics throughout the campus. This should not affect the project completion date as crews are planning to make up the time by working weekends and extended hours next month.

The project risks is red due to the inclement weather and servers which were delivered last month weren't configured with the correct hardware specifications. The impact of the inclement weather on the schedule will be mitigated by having crews make up the time by working weekends and extended hours next month. Currently we are working with the server vendor to resolve the server hardware configuration problem. The configuration delivered will not handle the work load of going live in two months; however, it is sufficient for development and testing activities scheduled prior to going live.

Work Planed for Last Month

For this section you can copy the "Worked Planned for Next Week" section from last week's status report and paste it into this section.

Work Completed Last Week

In this section you should provide a highlight of work performed and milestones and/or deliverables met during the past week.

Work Planned For Next Week

Provide an overview of the work being performed during the next week and any milestones or deliverables you expect to meet.

Open Issues

This section should contain a list of open issues along with their status.

Open Risks

This section should contain a list of all open risks (risks which have occurred, or are on the verge of occurring).

Deliverables and Milestones

Milestone

WBS

Planned

Forecasted

Actual

Status

Deliverable

WBS

Planned

Forecasted

Actual

Status

Open Change Requests

Change Request Name

Change Request Number

Request Date

Current Status

Add xyz Functionality

CR55043

3/14/20xx

In Review by Change Control Board

Add Redundant Servers

CR55012

2/17/20xx

Approved and Being Added to the Project Plan

Key Performance Indicators (KPI's)

Schedule – Project is Ahead of Schedule

Schedule Variance (SV): $xxxx

Schedule Performance Index (SPI): x.xx

Cost – Project is Under Budget

Cost Variance (CV): $xxx

Cost Performance Index (CPI): x.xx

Are you struggling with this assignment?

Our team of qualified writers will write an original paper for you. Good grades guaranteed! Complete paper delivered straight to your email.

Place Order Now